GE Transportation needed to modernize the existing turbocharger test stand in their diesel engine test lab Building 18, Cell A to allow for steady state testing of both single-stage and dual-stage turbochargers for Tier IV emissions compliant locomotive engines. ACS designed and supplied a new controls & data acquisition system, updated instrumentation and controls, water and oil supply conditioning units and an inter-stage cooler between the low and high-pressure stage compressors. The turbocharger test cell will be capable of testing single-stage and dual-stage turbocharger arrangements as well as the Tier 4 dual-stage turbochargers for all engine families (Inline 6, Inline 8, V12, and V16.) ACS provided complete installation and commissioning of the test cell equipment.
ACS held a single-source contract for test facility design and construction management; equipment design and component specification, equipment build, procurement and contractor installation; integration of equipment, facility and control systems; and commissioning.