ACS held a single source contract for design and construction with Kettle Foods to provide architectural, engineering and construction services on a new potato chip manufacturing facility. The 75,000 square foot potato chip manufacturing facility is the eighth LEED® Gold and first Industrial LEED® certified building in the state of Wisconsin. ACS provided fundamental commissioning services and hired a consultant to provide enhanced commissioning services.
Design-Build