Linde is the world’s largest industrial gas company. With funding from the US Department of Energy, the company is testing three technologies to find the one most effective at reducing aerosol particle concentrations in flue gas of coal-fired power plants.
Reducing the amount of solvent lost will make carbon capture technology less expensive, encouraging its adoption on a wider scale. Such technology is critical in the fight against climate change.
Linde furnished one of the technologies for the test, an electrostatic precipitator. ACS was engaged to fabricate a high-velocity spray tower and a media filter that could be tested against the precipitator. The project also required piping and a control panel.
Challenges included:
ACS was chosen because it not only has expertise with custom fluid processing equipment and systems, but also has the ability to hold construction contracts and manage installation and commissioning of the equipment.
Working with the client and research partners, ACS developed flow diagrams into full process and instrumentation diagrams:
ACS engineered all the mechanical systems for the project, using off-the-shelf components where possible and fabricating custom components where needed. It also supervised the build of the pilot plant, managing all subcontractors performing construction activities and keeping project stakeholders apprised of the build’s progress.
An Allen Bradley CompactLogix PLC with PanelView Plus 1500 underpinned the controls automating the tests. A data collection module was implemented to measure temperatures, pressures, and flow rates.
All of the equipment was factory tested to ensure functionality before being commissioned on site. This minimized the time spent on site and ensured the unit met standards and specifications before delivery.
Once construction was complete, ACS stayed on site until the process gas was flowing to ensure the equipment was functioning properly and collecting the appropriate data. The equipment is conducting its tests at an Illinois power plant.
Linde was able to get equipment and controls designed, fabricated, and installed; the construction site managed; and, at the conclusion of the test, the entire build dismantled and removed – all with a single contract from ACS.
“This project is funded by the U.S. Department of Energy with Linde Gas North America LLC as the prime awardee.”