ACS has sole source responsibility with all design consultants, construction contractors and equipment vendors subcontracted through ACS during the development of the 15,000 sq. ft. building.
Key Performance Features:
- Greenfield site with full site development and primary utilities extension into new 15,000 sq. ft. building
- Extensive permitting requirements including use of low NOx boilers (3ppm)
- Greenfield site requiring all new secondary systems including standby boilers, chillers, air handling units, exhaust fans, air compressors and vacuum pumps
- Project includes holding rooms, procedure rooms
- Innovative engineering and architectural integration to facilitate reduced construction time and ease of ongoing maintenance
ACS Services:
ACS held a single-source contract for design and construction management; equipment specification, procurement and installation; integration of equipment and facility systems; and commissioning