ACS designed and built the research and development space for Generac Power Systems, Inc. The renovation was transformed into a “like new” space previously used for manufacturing. ACS used critical chain methodology to manage scheduling and complexity of working in an operating facility.
In support of Generac’s strategic vision of a world-class R&D facility, ACS provided initial planning and project development services to fully define Generac’s testing and facility requirements. ACS developed a total project budget and program schedule that became the basis for approval of the capital investment. ACS was awarded contracts for all phases of the project including pre-construction services, construction management, equipment procurement and integration and commissioning.
Construction of three labs (Alternator Lab, Transfer Switch Lab, and Electronics Lab) to support the development and testing of new and existing products, including Generac’s standby power generators.
Extensive refurbishment of masonry walls and steel building columns:
The space was transformed to meet the goal of looking as if it were new construction.